- © Copyright of Vietnamnet Global.
- Tel: 024 3772 7988 Fax: (024) 37722734
- Email: [email protected]
Update news national power master plan
The Ministry of Industry and Trade (MoIT) has consulted the Government not to include 14,120 MW of coal-fired power in the national power master plan (PDP8) to achieve the goal of net zero emissions by 2050.