- © Copyright of Vietnamnet Global.
- Tel: 024 3772 7988 Fax: (024) 37722734
- Email: [email protected]
Update news vu gia river
VietNamNet Bridge – Da Nang authorities have said to take the Ministry of Natural Resources and Environment nd the Dak Mi 4 Hydropower Plant to the court if these agencies do not revise the draft regulations on operating hydropower reservoirs.
Deputy Chief of the National Assembly delegation of Da Nang - Huynh Nghia – has confirmed to report to the National Assembly the issue related to Dak Mi4 hydropower plant, which did not discharge water to save the downstream region from drought.