- © Copyright of Vietnamnet Global.
- Tel: 024 3772 7988 Fax: (024) 37722734
- Email: [email protected]
Update news Nhue-Day river
VietNamNet Bridge – Prime Minister Nguyen Tan Dung has approved a plan to treat solid waste in the Nhue-Day river basin through 2030, in which 18 treatment plants will be upgraded or built.
VietNamNet Bridge – The Prime Minister has approved a master plan for the building of an extensive drainage and waste water treatment system in residential areas and industrial parks in the Nhue-Day river basin by 2030.