- © Copyright of Vietnamnet Global.
- Tel: 024 3772 7988 Fax: (024) 37722734
- Email: [email protected]
Update news Fine-tuned PPP rules needed to lure foreign investment in transport
The Ministry of Transport estimated that the total capital for developing the transport infrastructure in the country for 2018-2023 is estimated at roughly (US$48 billion).
The Ministry of Transport estimated that the total capital for developing the transport infrastructure in the country for 2018-2023 is estimated at roughly (US$48 billion).